Well I picked up this car in December of 2008 from my Dad.
This Rust Belt machine has nothing unrotted or unrusted anywhere on the car.
This car has an indeterminate amount of mileage on it. Maybe 150-300,000??
7/5/09
So far I am doing all the sheet metal work welding, fabbing etc. Anything that is rotted that is not needed to go down the track is getting cut off the car and what's left is welded up. I am almost done with the sheetmetal work. I need to get another tank of C02 For the welder and I Am going to buy a floorpan segment at carlisle this weekend. I also Have one more quarter panel to re-attatch to the Wheelhouse.
Front suspension has been switched over to Big Bolt with Big Upper Ball joints using Volare Discs Calipers, rotors, Hoses etc. Lower Ball joint is 73-76 A body disc Brake Style.
Dash is stripped except for the frame.
Battery is moved to the trunk and Master Switch added.
Upcoming plans:
Fuel Cell
8 3/4" rear
Inboard Springs
LR Frame Reinforcement
Drivetrain Will happen over the Winter as Time and budget allow.
Hope to hit the track in Spring 2010.
Pics:
I found a Pic of this car From 1989 When My Dad Sold it on the Used car lot.. I was Sure Looking Pretty Back then!
Front View. - It's worse than it looks!
Rear View.
Hopefully All this will be repalced by a 12 Second Drivetrain.
Right Quarter Rot.
Left Quarter Repair - Right Will look about the same! Black and gold for Pittsburgh!
More Rot
Fred Flintstone Style Floors - This is before I did any cutting Here!
